TERMINAL BULKS LIQUIDS
-
Granel liquid loading/unloading operation
-
Operation of chemical, agri-food and other products
-
Independent pipeline pool
-
Ships up to 9.50m (IMO load) and 10.00m (non-IMO load) DRAFT
-
Ships up to 190m LOA
"JETTY" type mooring pier, with 2 d'Alba docks, 70 m apart, and designed for thrusts of up to 35,000 DWT.
Centered with the Ducs d'Alba, there is the technical Duc d'Alba, equipped with a retention basin and containing the fixed "manifolds" of the pier, in addition to the surveillance and security equipment.
This Duc d'Alba is connected to the Ducs d'Alba mooring and land, by a metal walkway that also serves the piperack with the different pipes used for each of the products.
A Duque d'Alba completes the installation, equipped with an automatic bollard, operating using compressed air.
All pipes that extend along the metal walkway and piperack cross the EN 10-4 road, in a technical gutter, with connection to the support Logistics Platform, basins and reservoirs and other Companies installed or to be built in the SAPEC Industrial Park Bay, with around 370ha.
Capability to operate ships up to 190 m long (LOA), draft (DRAFT) 10 m, with a rotation basin built at -10.5 m (ZH).
As in the Port Terminal for solid bulk, the possibility of docking ships with other characteristics will be analyzed on a case-by-case basis.